Project References

29kW 3-PHASE GRID-TIED

Installed and commissioned October 2018 for the first all-green container school in Siem Reap, the system utilizes data logging communications to track real time energy production over internet connection.

5.4kW SOLAR WATER PUMP

System installed in Kep in June 2018. Hybrid system powered by solar and generator backup.

10.6kW SOLAR BATTERY CHARGING STATION

Completed in November 2017 at Koh Kong. This system replaces diesel power and will lower the cost of energy for the community by over 20% for the next 20 years.

2.8kW SOLAR WATER PUMP

Solar water pump installed September 2017 to provide for local schools.

2.8kW SOLAR WATER PUMP

A repeat design of the previous tower solar water pumping system, completed June 2018.

9kW GRID-TIED WITH BATTERY BACKUP

Completed January 2017, this home system uses energy storage to provide power during grid outages. The inverter logs data for remote tracking.

1.728MWh CELLCARD BATTERY REPLACEMENT

Supplied and installed high capacity replacement backup power June 2017 at a main telecommunications site.

27kW UNICEF HEALTH CENTERS

Completed installation in April 2017 for a total of 18 health centers across Cambodia to improve the quality of healthcare.

4.2kW OFF-GRID SOLAR

Installed off-grid home solar system in June 2017.